Application

Grid load management for a single EV rapid charger.


Problem

Allego installed a 50kW rapid charger, on the motorway in Kircheim.
The connection capacity was insufficient to supply the charger.
The problem was how to ensure that the use of the charger did not cause the grid constraint to be exceeded.


Solution

An E-STOR system was installed in active load management mode. Operating in this way the chargers are controlled by the E-STOR system via OCPP and only allowed to charge the vehicle when the combined power available from the grid and the E-STOR are sufficient to ensure the constraint will not being exceeded.

Project stats

Allego

Client

60kW/90kWh

System size

EV charging

System functionality

More projects

Allego Germany

Read more

Dundee City Council

Read more

Bryt Energy Wales

Read more

Connected Energy Norfolk

Read more

Engie Netherlands

Read more

Allego Belgium

Read more

The energy landscape has shifted. The debate isn't just about how much energy we use, it's also about when we use it

Matthew Lumsden

- CEO, Connected Energy